Pier 45

Fish Processing Facility, Storm Drain and Sanitary Sewer Improvements at Pier 45

YEI provided a new sewerage lift station and Boat Hold wastewater pump out systems. The design included power for the lift station pumps and boat hold wastewater pumps, an electrical meter for the system and a manual transfer switch for the lift station.

Client
Port of San Francisco
Project Location

San Francisco, CA